EasyManua.ls Logo

Eaton KA349WE - Testing

Eaton KA349WE
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11MERCURY SWITCH TO MICROSWITCH RETROFIT KIT KA349WE INSTALLATION INSTRUCTIONS MN280022EN October 2015
Testing
Use an ohmmeter or multimeter to perform the following
tests:
1. Testing one switch at a time, attach ohmmeter leads to
switch terminal screws.
2. Check the switch for an open or closed condition as
specified in Table 3.
3. If a switch fails test, review its positioning. If positioned
correctly, review switch terminal and terminal block
connections. If all connections are correct, check
switch to make sure it actually opens and closes as its
arm changes position. Review switch cam for correct
position. Check cable wires to ensure continuity exists
within each wire.
Table 3. Switch status for contact and lever positions
Recloser Contacts Manual Operating Lever SW1 (C & D Terminals) SW2 (F & N Terminals) SW3 (A & N Terminals)
Open Down Open Open Closed
Open Up Open Closed Closed
Closed Up Closed Closed Open

Related product manuals