EasyManua.ls Logo

Eaton MBP6Ki - Mechanical Mounting; Installation requirements

Eaton MBP6Ki
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 10
SK-90510-Y4_EN
3.4 Mechanical Mounting
• Mount the MBP (on the UPS, on the EBM, in the rack or on the wall), see 2.1.
3.5 Installation requirements
Recommended protective devices and cable cross-sections
1. Recommended upstream protection
Refer to the UPS User Manual for circuit breaker current rating.
The circuit breaker has to be installed upstream the MBP Normal AC source.
2. Recommended cable cross-sections
3. Installation
Terminal
position
Wire
function
Terminal wire
size rating
Minimum input wire
size rating
Tightening
torque
MBP6ki
L1 Phase
0.5-10 mm
2
(20-8 AWG)
6 mm
2
(10 AWG) 105°C
10 mm
2
(8 AWG) 75°C
1 Nm
(10 lb in)
N (L2)
Neutral
(Phase)
Ground
MBP11ki
L1 Phase
4-25 mm
2
(12-4 AWG)
10 mm
2
(8 AWG) 105°C
16 mm
2
(6 AWG) 90°C
2 Nm
(18 lb in)
N (L2)
Neutral
(Phase)
Ground
MBP11ki31
L1 Phase
4-25 mm
2
(12-4 AWG)
10 mm
2
(8 AWG) 105°C
16 mm
2
(6 AWG) 90°C
2 Nm
(18 lb in)
L2 Phase
L3 Phase
N Neutral
Ground
Copper wire, solid or stranded.

Related product manuals