UPS Installation Plan and Unpacking
3-20 Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09 www.eaton.com/powerquality
Table 3-9. 480V Input/Output Ratings and External Wiring Requirements for the Two UPM Models – Common Battery
Basic Unit Rating
Units
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
Rating
50/60 Hz
kVA
kW
450
450
500
500
550
550
600
550
600
600
Input and Output Voltage Volts 480/480 480/480 480/480 480/480 480/480
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps 668 742 817 817 891
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(5)
500
(5)
500
(5)
500
(5)
500
(5)
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Ground
B
Amps 541 601 662 722 722
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(4)
500
(4)
500
(4)
500
(4)
500
(4)
DC Input from Battery Disconnect to UPS
(1) Positive, (1) Negative, (1) Ground
C
Total
Amps
603 603 603 603 658
Minimum Conductor Size
Number per Pole
AWG or
kcmil
(each)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Ground
D
Amps 541 601 662 722 722
Minimum Conductor Size
Number per Pole
AWG or
kcmil
(each)
500
(4)
500
(4)
500
(4)
500
(4)
500
(4)
NOTE VCallout letters
A, B, C, and D map to Figure 6-5. Callout letters A, C, and D map to Figure 6-15.
NOTE V Bypass wiring data is not applicable to IOM configurations
.
Battery Conductor Sizing: Eaton strongly recommends using the specified DC conductor size and quantity shown above for optimum system
performance and battery run time.
Battery Cable Routing Requirements
Conduit applications:
* Each conduit must have a Positive, Negative, and Ground conductor.
* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required in each conduit.
Raceway applications:
* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).
* There must be a ground cable running in the raceway with the battery cables.
NOTE V If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may interrupt the
UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in
both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly, however it is important to evaluate whether the critical load will function properly as its neutral reference is rapidly
(50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will interrupt the
return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the transition.