P-164000476 9395P 500kVA / 600 kVA 133
Revision 002 Userās and Installation Guide
9.3 Installing batteries
There is no DC disconnect device within the UPS.
Install batteries in accordance with the battery and battery cabinet or battery rack manufacturerās
instructions.
9.4 Recycling the used UPS or batteries
Before scrapping UPS or its battery cabinet, the battery bank must be removed. Local requirements
must be followed in battery recycling or discard. The removal of batteries is allowed only by authorised
service personnel due to high energy and voltage.
Do not discard waste electrical or electronic equipment in the trash.
For proper disposal, contact your local collecting/recycling/reuse or hazardous waste center and follow
the local legislation.
These symbols indicate on a product:
Use proper local collecting centers meeting local legislation when handling waste of electrical and
electronic equipment.
HAZARDOUS MATERIALS. Batteries may contain HIGH VOLTAGES, and
CAUSTIC, TOXIC and FLAMMABLE substances. Batteries can injure or kill people
and damage equipment if used improperly. DO NOT DISCARD unwanted batteries
or battery material in the public waste disposal system. Follow ALL applicable,
local regulations for storage, handling and disposal of batteries and battery
materials.
9.5 Maintenance training
A basic training course, available from Eaton Corporation, gives you a competent working knowledge
of the UPS system operation and teaches you how to perform first level corrective maintenance. For
more information about training and other services, contact the Eaton Help Desk for Eaton products.