P-164000476 9395P 500kVA / 600 kVA 55
Revision 002 Userās and Installation Guide
To locate the appropriate terminals on the HotSync CAN Bridge Card, see Figure 5-2 and Table 5-1 on
page 55.
Figure 5-2. HotSync CAN Bridge Card connections
Table 5-1: HotSync CAN Bridge Card interface connections
1J3
2 Connections for Parallel Systems Control
3 Connections for RPM II, RIM II, or SCM II
4 Connections for Bypass Status
5Alarm
J3 Terminal Name Description
1Alarm
Programmable UPS alarm. Activate by a remote dry contact closure.
2 Alarm Return
3 Alarm Relay NC Normally-closed contact opens when UPS is on bypass.
4 Alarm Relay Com Bypass contact return.
5 Alarm Relay NO Normally-open contact closes when UPS is on bypass.
6TX
RMP II, RIM II, and SCM II connections.
7TX
8CAN L
CAN interface for parallel operation.9CAN H
10 Shield
1
2
3
4
5