EasyManua.ls Logo

Eaton Powerware 9155 - UPS Setup; Inspecting the Equipment; Floor Loading

Eaton Powerware 9155
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9x55 8–15 kVA Battery Upgrade (8–15 kVA) —Rev 1 9
6. Using a voltmeter, measure the voltage between the positive (+) and negative (-) disconnected harness
from each shelf/string to verify that there is no voltage.
Figure 8. Verify Zero Voltage
WARNING
After performing Step 6, there will still be full battery string voltage between the positive (red) and negative
(black) terminals of the battery trays.
Battery Upgrade Procedure

Other manuals for Eaton Powerware 9155

Related product manuals