1 DA1 device series
1.12 Charging the internal DC link capacitors
36 DA1 Variable Frequency Drives 11/16 MN04020005Z-EN www.eaton.com
1.12 Charging the internal DC link capacitors
After extended
storage times or
extended downtimes during which no
power is supplied (> 12 months), the capacitors in the internal DC link must
be recharged in a controlled manner in order to prevent damage. To do this,
the DA1 variable frequency drive must be supplied with power, with a
controlled DC power supply unit, via two mains connection terminals
(e.g. L1 and L2).
In order to prevent the capacitors from having excessively high leakage
currents, the inrush current should be limited to approximately 300 to 800
mA (depending on the relevant rating). The variable frequency drive must not
be enabled during this time (i.e. no start signal). After this, the DC voltage
must be set to the magnitudes for the corresponding DC link voltage
(U
DC
1.41 x U
e
) and applied for one hour at least (regeneration time).
• DA1-12…, DA1-32…: about 324 V DC at U
e
= 230 V AC
• DA1-34…: about 560 V DC at U
e
= 400 V AC
• DA1-35…: about 705 V DC at U
e
= 500 V AC
1.13 Service and warranty
In the unlikely event that you have a problem with your DA1 variable
frequency drive, please contact your local sales office.
When you call, have the following data ready:
• The
exact
variable frequency drive
part number
(see nameplate),
• the date of purchase,
• a detailed description of the problem which has occurred with the
variable frequency drive.
If some of the information printed on the rating plate is not legible, please
state only the data which are clearly legible.
Information concerning the guarantee can be found in the Terms and
Conditions Eaton Industries GmbH.
Break-Down Service
Please contact your local office:
http://www.eaton.eu/aftersales
or
Hotline After Sales Service
+49 (0) 180 5 223822 (de, en)
AfterSalesEGBonn@eaton.com