EasyManua.ls Logo

Eaton PowerXL DA1 - 3.5 EMC installation; 3.5.1 EMC compliance in the control panel

Eaton PowerXL DA1
203 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Installation
3.3 Mount ing
DA1 Variable Frequency Drives 11/16 MN04020005Z-EN www.eaton.com 79
To do this, place the variable frequency drive on the mounting rail from
above [1] and press it down until it snaps into place [2].
Figure 44:Fixing on mounting rails
Dismantling from mounting rails
To remove the device, push down [2] on the clip being held by a spring
force [1]. There is a marked recess at the bottom edge of the device that
is intended for this purpose.
A flat-bladed screwdriver (blade width 5 mm) is recommended for
pushing down the clip.
Figure 45:Dismantling from mounting rails
Now pull the lower edge away from the mounting surface (towards you)
[3] before lifting the variable frequency drive off the mounting rail.
2
1
E
M
C
V
AR
EMC
VAR
2
1
3
EMC
VAR
f 5 mm
(f 0.197“)

Table of Contents

Other manuals for Eaton PowerXL DA1

Related product manuals