EasyManua.ls Logo

Eaton PowerXL Series - Figure 33. RS-485 Bus Termination Setup; Figure 34. Bacnet Bus Termination

Eaton PowerXL Series
256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70
BACnet MS/TPOn-Board Communication
POWERXL SERIES VFD MN040010EN—June 2018 www.eaton.com
Figure 33. RS-485 Bus termination setup
BACnet MS/TP bus termination
Figure 34. BACnet bus termination
7. Remount the AC drive cover.
ote: N When planning the cable runs, remember to keep the
distance between the fieldbus cable and the motor
cable at a minimum of 11.81 in (30 cm).
8. The bus termination must be set for the first and last
device of the fieldbus line. See illustration below.
Seealso step 6 above. We recommend that the first
device on the bus terminated is the Master device.

Table of Contents

Related product manuals