4. Commissioning
4.1 Initial Commissioning
4. Commissioning
CAUTION
SHORT-CIRCUITHAZARD
IftheXV300TouchPanelisorhasbeenexposedtoenvironmentalfluc-
tuations(ambienttemperature,airhumidity),condensationmayformonor
insideit.Aslongasthiscondensationispresent,therewillbeashort-circuit
hazard.
DonotswitchontheXV300TouchPanelwhenithascondensationinoron
it.
IftheXV300hascondensationinoronit,orifthepanelhasbeenexposed
toenvironmentalfluctuations,letthepanelsettleintotheexistingambient
temperaturebeforeswitchingiton.DonotexposetheXV300TouchPanel
todirectthermalradiationfromheatingappliances.
Apply an XV300 to the 24 VDC supply voltage unit
The XV300 unit will boot up.
The XV300 Touch Panel does not come with any runtime software for
visualization or PLCs installed.
The corresponding software packages can be used to install the
required runtime software on the XV300 unit.
4.1 Initial Commissioning
Carry out the following steps once:
Configure the XV300 unit's system settings as necessary.
Install the required software packages.
4.2 Running the XV300
Once the XV300 has been initially commissioned, it will run whenever it is connected to
the supply voltage.
In other words, it does not have to be separately switched on and off.
Reducing the level of brightness will increase the backlight's
lifespan.
See also
System description Windows CE 7
MN050004EN
If the XV300 doesn't boot or an alarm occurs, follow the instructions
→ Section "Interferences", page 65.
46
XV30012/15 MN048017 ENwww.eaton.eu