2.2.2 Personnel qualifications 24
2.2.3 Device documentation 24
2.2.4 Installation, maintenance, and disposal 25
2.2.5 Prerequisites for proper operation 25
2.3 Device-specific hazards 27
3. Installation 31
3.1 Prerequisites for the location of use 31
3.1.1 Installation position 31
3.1.1.1 Temperatures 31
3.1.1.2 Aeration and de-aeration 32
3.1.1.3 Criteria for the installation position 33
3.1.2 Technical conditions for acceptance by Underwriters Lab-
oratories Inc. (UL) 34
3.2 Unpacking and checking the equipment supplied 35
3.3 Mounting 36
3.3.1 Fixing and sealing 36
3.3.2 Front mounting XV-303 37
3.3.3 Rear (panel) mounting XV-313 39
3.4 Preparing the device for operation 41
3.4.1 Functional earthing XV300 43
3.4.2 Power supply - electrical connection 44
4. Commissioning 46
4.1 Initial Commissioning 46
4.2 Running the XV300 46
5. External connections 47
5.1 Layout of interfaces 48
5.1.0.1 Optional interfaces 48
5.2 SD card 49
5.3 USB interfaces 50
5.3.1 USB Host 50
5.3.2 USB device 50
5.4 Ethernet 1, Ethernet 2 51
5.5 Serial interfaces for communication with PLCs or devices 52
XV30012/15 MN048017 ENwww.eaton.eu
5