EasyManua.ls Logo

Ecolab Elados EMP II E60 - Page 30

Ecolab Elados EMP II E60
54 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tube connection
1
2
3
4
1 Conduit
2 Union nut
3 Insert component
4 O-ring
n Trim the tube (pos. 1) to the precise length.
n Push union nut (pos. 2) over tube.
n Weld or glue insert (pos. 3) to the pipe.
n Place O-ring (pos. 4) into groove of suction/pressure valve.
n Tighten up union nut.
4.2 Electrical connections
4.2.1 Power supply
EMP KKS & EMP II
L1
PE
N
*
L1 Mains / external conductor
PE Protective earth wire
N Neutral wire
* not assigned
Assembly see Fig. 2, pos. 13.
EMP III & EMP IV
EMP III EMP IV
1
1
2
3
1 Powerline
2
Connecting lead to control
PCB (in the pump housing)
3
Connecting lead to the start-up
electronic system
(in terminal box lid)
EMP III assembly see Fig. 3, Pos. 15.
EMP IV assembly see Fig. 3, Pos. 15
Device installation
13 MAN033535 Rev. 06-04.2020

Other manuals for Ecolab Elados EMP II E60

Related product manuals