4
Specifications:
Voltage: AC 120V~60Hz
Input Power:600W
Please read this user manual carefully before assembling and using.
PART 1. HOW TO ASSEMBLE THE POPPING KETTLE:
PARTS & ASSEMBLY
ASSEMBLY INSTRUCTIONS
1. Screw the lid, axle fixer and stirrer onto the gear box in clockwise
(Figure 1).
2. Hold the kettle on the supporter (Figure 2).
3. Insert a pin through the kettle and supporter (Figure 3).
4. Use a pin to fix kettle at the right position (Figure 4).
5. Finally insert the internal plug into the socket on the inner top of the
1. Place the kettle (B) on the
supporter after completing
Part 1 of the Assembly
Instructions.
2. Put the block plate (C) onto
the front of the unit.
3. Insert the detachable plastic
door (D) onto the hinges.
4. Slide the crumb tray (E) into
the hole at the bottom of
the unit.