1.2.2 T-200 transducer assembly
Figure 1-1: T-200 transducer assembly
A. Meter housing
B. Captive screw
C. T-200 transducer stalk assembly
D. Cable nut
E. Chordset
Procedure
1. Leave T-200 transducers installed on the 3410 Series Gas Ultrasonic Meter while the
line is pressurized.
2. Run the field hydrostatic test.
1.3 Routine maintenance
Routine maintenance operations requires adherence to all applicable regulations and laws
and safety training for personnel to perform the maintenance operations. Review your
organization's best practices procedures before performing routine maintenance.
Maintenance Maintenance and Troubleshooting manual
July 2020 3-9000-769
14 Gas Ultrasonic Flow Meters