EasyManua.ls Logo

emmeti SHARK E - Page 31

emmeti SHARK E
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Accensione
31
GBGB
4. INSTALLATION AND ELECTRICAL CONNECTION
• Earth the pump according to the regulations. Dismantle the plug in accordance
with Fig. 5. A screwdriver is needed for this.
• The electrical connection is to be established via a fixed connection line equipped
with a connector device or an allpole switch with a contact opening width of at
least 3 mm.
• To ensure drip protection and strain relief at the PG screwed connection, a con-
nected load with an adequate outer diameter is necessary (e.g. H05VV-F3G1.5
or AVMH-3x1.5).
• When pumps are used in systems with water temperatures above 90°C, a suita-
bly heat-resistant connected load is installed.
• The connected load is to be placed in such a way that it can under no circumstan-
ces come into contact with the pipe and/or the pump and motor housing.
• The switching of the pump via triacs/solid-state relays is to be checked on an
individual basis.