EasyManua.ls Logo

EMPORIA Vue - Page 10

EMPORIA Vue
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 3: Find a place
for the monitor
Locate a place within the electrical panel for
the Vue energy monitor ensuring it is at
least 50.8mm (2 in) from any live parts
including primary conductors, primary
terminals, and primary lugs; but excluding
insulated cables. The breaker box may be
oriented differently than below, but the
monitor is small and designed to fit easily in
the box. Find a place that works. If the Vue
is to be mounted on a DIN rail, the monitor
has two threaded screw holes to attach
mounting hardware using two M3 screws
and lock washers (sold separately).
Energized
service
mains
DANGER: The service
mains are energized!

Related product manuals