EasyManuals Logo

EMPORIA Vue User Manual

EMPORIA Vue
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Step 5(a): No solar
Main CT installation
Open the clasps on the CTs and place each
clamp around one of the main service cables.
Then, shut the clasps to secure the CTs.
IMPORTANT! The Breaker imprint on the
bottom of the CTs should point toward the
breakers. Finally, insert the screw terminal
plugs into the ports on the right side of the
monitor. To avoid clutter, unscrew the 22
AWG wires from the screw terminals, cut
them to size, and reattach them ensuring the
black and white wires match the icons on the
front of the Vue.
DANGER: The service
mains are energized!
Breakers
Meter

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EMPORIA Vue and is the answer not in the manual?

EMPORIA Vue Specifications

General IconGeneral
TypeEnergy Monitor
CommunicationWi-Fi
ConnectivityWi-Fi
Voltage120/240V
Current Sensors50A/200A
Data LoggingYes
Real-time MonitoringYes
Historical DataYes
Frequency60Hz
DisplayNone (App-based)
Maximum Amperage200A
Power SourceHardwired (120-240V AC)

Related product manuals