Fastlane
®
Swim Unit Installation
Section 13 DECK MOUNTED FASTLANE BONDING
!
"
1. Stainless steel bonding wire that
exits the top of the Fastlane
attached to bonding lug on the
hose cover tray.
2. Bonding lug on hose cover
tray tied to pool equipment with
#8 solid copper wire.
3. Hydraulic Po wer Unit and
Controller tied to pool
equipment with #8 solid
copper wire.
!
Fig. 13.2
41
D