EasyManua.ls Logo

Endless Pools FastLane - INSTALLATION PROCEDURES; Wall Mount Fastlane Installation

Endless Pools FastLane
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fastlane
®
Swim Unit Installation Fastlane
®
Swim Unit Installation
Section 4 WALL MOUNT BRACKET
Note: Please read instructions fully prior to installing the wall mount bracket.
4.A. Gunite Pool
If the pool being constructed is gunite, please follow the instructions below.
The Wall Mount Fastlane Mounting Kit for Gunite pools includes the following:
(refer to Fig 4.1)
(1) PVC Wall Bracket
(2) Bonding Clamp
(2) 3/8" (9,5mm) Stainless Steel Threaded Mounting Rod
(6) 3/8" (9,5mm) Stainless Steel Jam Nut
(6) 3/8" (9,5mm) Stainless Steel Flat Washer
(2) 3/8" (9,5mm) Stainless Steel Lock Washer
(2) 1-1/2" (38mm) Thru-Wall Fitting
(2) 1-1/2" (38mm) MPT x 1” (25mm) FPT Bushing Reducer
(2) 1" (25mm) Liquid Tight Fitting
1" (25mm)
Liquid Tight Fitting
1-1/2" (38mm) x 1" (25mm)
Bushing Reducer
Thru-Wall Fitting
Rubber Gasket
Threaded Rod
1-1/2" (25mm) PVC Flex
(Supplied By Others)
Thru-Wall Fitting
Lock Nut
Cork Gasket
Bonding Clamp
Wall Bracket
Jam Nut
Lock Washer
Flat Washer
Flat Washer/Jam Nut
(Back Of Bracket)
Flat Washer/Jam Nut
(Front Of Bracket)
Fig. 4.1
Secure the thru-wall ttings to the bracket as shown in Fig 4.1. The rubber gasket should be between the
thru-wall and the bracket on the poolside of the bracket and the cork gasket should be between the bracket
and the locknut on the outside. Tighten the lock nut with a pair of channel locks or strap wrench.
W
6

Other manuals for Endless Pools FastLane

Related product manuals