Gammapilot FMG50 HART Commissioning
Endress+Hauser 19
‣
A0039185
3 Options for remote operation via HART protocol
1 PLC (programmable logic controller)
2 Transmitter power supply unit, e.g. RN221N (with communication resistor)
3 Connection for Commubox FXA191, FXA195 and Field Communicator 375, 475
4 Field Communicator 475
5 Computer with operating tool (e.g. DeviceCare/FieldCare , AMS Device Manager, SIMATIC PDM)
6 Commubox FXA191 (RS232) or FXA195 (USB)
7 Field Xpert SFX350/SFX370
8 VIATOR Bluetooth modem with connecting cable
9 RIA15
10 Device (FMG50)
Connect one or more operating units to the device.
7 Commissioning
7.1 Post-installation and post-connection check
Perform the post-installation check and the post-connection check for the FMG50 prior to
commissioning the measuring point.
You can reset the device to the factory setting in the event of an error.
7.1.1 Resetting to the default configuration
L
CAUTION
‣
A reset may negatively impact the measurement. As a rule, a basic setup must be
performed again after a reset. All calibration data are deleted after a reset. A complete
recalibration is needed to put the measurement back into operation.
1. Connect the device with FieldCare or DeviceCare.