Mounting Liquiphant FTL31
12 Endress+Hauser
If installing in vessels with high-viscosity liquids (A), the tuning fork may not be located in
the installation socket!
If installing in vessels with low-viscosity liquids (B), the tuning fork may be located in the
installation socket.
The installation nozzle must be no less than the minimum diameter of 50 mm (2.0 in).
ø50 (2.0)³
A
B
A0022054
 4 Installation options with consideration given to the liquid viscosity, dimensions in mm (in)
A High viscosity (< 10 000 mPa·s)
B Low viscosity (< 2 000 mPa·s)
5.1.4 Buildup
Make sure that the installation socket does not exceed a certain length so that the tuning fork
can project freely into the vessel.
Possibilities for optimization:
A vertical orientation of the point level switch keeps buildup to a minimum.
Preferably flush-mounted on vessels or in pipes.