Liquistation CSF34 Installation
Endress+Hauser 13
Protect the device against strong magnetic fields.
Make sure air can circulate freely at the side panels of the cabinet. Do not mount the device
directly against a wall. Allow at least 150 mm (5.9") from the wall to the left and right.
Do not erect the device directly above the inlet channel of a wastewater treatment plant.
4.1.3 Mechanical connection
Foundation plan
302 (11.9)
195.4 (7.69)
C
C
D
B
A
A
AA
137.4 (5.41)
355 (14.0)
61 (2.4)
605 (23.8)
730 (28.7)
786 (30.9)
214 (8.43)
255 (10.0)
311 (12.2)
305 (12.0)
33.6 (1.32)
A0024406
 4 Foundation plan
A Fasteners (4 x M10)
B Cable inlet
C Outlet for condensate and overflow > DN 50
D Sample supply from below > DN 80
--- Dimensions of Liquistation