Liquistation CSF48 Installation
Endress+Hauser 19
7. Do not mount the sampler directly over the inlet channel of a municipal wastewater
treatment plant.
For version with sampling assembly
Note the following when installing the sampling assembly in pipelines:
1. The best installation location is in the ascending pipe (position 2). Installation is also
possible in the horizontal pipe (position 1).
2. Avoid installation in the down pipe (position 4).
3. Avoid siphoning effects in the suction line.
4. The vertical distance between the assembly and sampler inlet should be at least 0.5 m
(1.65 ft).
a0015886
Fig. 11: Installation conditions for Liquistation CSF48 with Samplefit CSA420 sampling assembly