EasyManua.ls Logo

Endress+Hauser prolevel FMC 661 - Sensor Connection

Endress+Hauser prolevel FMC 661
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.4 Sensor connection
Sensor cable
Use commercial 2-core installation cable, max. line resistance 25 /core, for the sensor/
transmitter cable — the Prolevel satisfies the quoted EMC standards with this cable.
Level probes and
sensors, channel 1
The Prolevel FMC 661 can be operated with a variety of sensor types, each requiring a
different electronic insert. For Channel 1, continuous level measurement:
EC 37 Z or EC 47 Z for capacitance and Multicap probes
EB 17 or EB 27 P for Deltapilots S
Level limit switch,
channel 2:
The level limit switch may be a vibration probe — Liquiphant (liquids) or Soliphant (solids)
— or a capacitance probe, with electronic insert
EC 16 Z/EC 17 Z for Multicap probes
EC 17 Z for other capacitance probes
EL 17 Z for Liquiphant probes
EM 17 Z for Soliphant probes
EC 37 Z and EC 47 Z The electronic inserts EC 37 Z and EC 47 Z have two measuring ranges which can be
selected by inserting a bridge between terminals 4 and 5 of the insert, see Fig 2.6. Full
instructions on selection of the insert are to be found in Publication E 07.80.06/1c.
Note the zero frequency f
o
____ and sensitivity S_____on the insert for the
range you have selected.
EC 17 Z The EC 17 Z electronic insert can be used at Channel 2 with capacitance and Multicap
probes for limit level switching. The connection diagram is shown in Fig. 2.6. Technical
information is given in Publication E 11.84.04/1a.
EC 16 Z The EC 16 Z electronic insert is for use on channel 2 with the Multicap probes with active
build-up compensation. Wire it up as described in the Technical Information Sheet
TI 170F delivered with the insert.
81 82
BA142_14
Channel 1
Insert bridge for
Range II (standard)
Remove for Range I
Ground
connection
Fig. 2.6:
Connection diagram for
electronic inserts
Left: Capacitance/Multicap
EC 37 Z/EC 47 Z
Right: Capacitance/Multicap
EC 17 Z
91 92
Insert bridge if
conductive
build-up on probe
Channel 2
Ground
connection
Insert bridge
(see instructions)
BA142_15
Chapter 2: Installation Prolevel FMC 661
16 Endress+Hauser

Related product manuals