Proline Promag 10 Commissioning
Endress+Hauser 41
4 Commissioning
4.1 Switching on the measuring device
On completion of the installation (successful post-installation check), wiring (successful
post-connection check) and after making the necessary hardware settings, where applicable,
the permitted power supply (see nameplate) can be switched on for the measuring device.
When the power supply is switched on, the measuring device performs a number of power-up
checks and device self-checks. As this procedure progresses the following messages can appear
on the onsite display:
The measuring device starts operating as soon as the startup procedure is complete.
Various measured values and/or status variables appear on the display.
Note! If an error occurs during startup, this is indicated by an error message.
4.2 Operation
4.2.1 Display elements
4.2.2 Operating elements
Display examples:
PROMAG 10
V XX.XX.XX
Start-up message
A0007557
Display lines/fields
1. Main line for primary measured values
2. Additional line for additional measured
variables/status variables
3. Current measured values
4. Engineering units/time units
A0007559
Operating keys
1. (–) Minus key for entering, selecting
2. (+) Plus key for entering, selecting
3. Enter key for calling the function matrix, saving
When the +/– keys are pressed simultaneously (Esc):
Exit the function matrix step-by-step:
> 3 sec. = cancel data input and
return to the measured value display
+48.25 xx/yy
+3702.6 x
1
2
3
4
Esc
E
+
-
1 2 3