EasyManua.ls Logo

Endress+Hauser Proline Promass E TB2 HART - 10.7 Simulation

Endress+Hauser Proline Promass E TB2 HART
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Proline Promass E TB2 HART Commissioning
Endress+Hauser 73
While this action is in progress, the configuration cannot be edited via the local display and a
message on the processing status appears on the display.
10.7 Simulation
The Simulation submenu enables you to simulate, without a real flow situation, various process
variables in the process and the device alarm mode and to verify downstream signal chains (switching
valves or closed-control loops).
Navigation path
"Diagnostics" menu ® Simulation
Structure of the submenu
Simulation
®
Assign simulation process
variable
Value process variable
Simulation current output 1
Value current output 1
Simulation current output 2
Value current output 2
Simulation device alarm
Parameter overview with brief description
Parameters
Prerequisite Description Selection/
User entry
Factory setting
Assign simulation
process variable
- Select a process
variable for the
simulation process that
is activated.
Off
Mass flow
Volume flow
Corrected volume
flow
Density
Reference density
Temperature
Off
Value process variable One of the following
options is selected in
the Assign process
variable parameter:
Mass flow
Volume flow
Corrected volume
flow
Density
Reference density
Temperature
Enter the simulation
value for the selected
process variable.
Depends on the
process variable
selected
-
Simulation current
output 1-2
- Switch simulation of
the current output on
and off.
On
Off
Off
Value current output
1-2
The On option is
selected in the
Simulation current
output 1-2 parameter
Enter the current value
for simulation.
3.6 to 22.5 mA Current value
currently measured

Table of Contents

Related product manuals