3.2 Degree of protection
The devices meet all the requirements for IP 67.
fter mounting in the field or service work, the following points have to be observed to ensure
that IP 67 protection is retained:
• Install the measuring device in such a way that the cable entries do not point upwards.
• Do not remove the seal from the cable entry.
• Remove all unused cable entries and plug them with drain plugs.
3.3 Post-connection check
• Are cables or the device damaged (visual inspection)?
• Does the supply voltage match the specifications on the nameplate?
• Are the power supply and signal cables correctly connected?
• Do the cables used comply with the necessary specifications?
• Do the mounted cables have adequate strain relief?
• Is the cable type route completely isolated? Without loops and crossovers?
• Are all screw terminals correctly tightened?
• Are all the cable entries installed, correctly tightened and properly sealed?
• Cable routed as a “water trap” in loops?
• Are all housing covers installed and correctly tightened?
Zusätzlich für Messgeräte mit Feldbuskommunikation
• Are all the connecting components (T-boxes, junction boxes, connectors, etc.) connected
with each other correctly?
• Has each fieldbus segment been terminated at both ends with a bus terminator?
• Has the max. length of the fieldbus cable and the spurs been observed in accordance with the
specifications?
• Is the fieldbus cable fully shielded and correctly grounded?
A0007549
Tighten the cable entries correctly.
A0007550
The cables must loop down before they enter the cable
entries (“water trap”).