EasyManua.ls Logo

Endress+Hauser Proline t-mass 65 - Page 25

Endress+Hauser Proline t-mass 65
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Proline t-mass 65 PROFIBUS DP/PA Installation
Endress+Hauser 25
Installation in control panel
1. Prepare the opening in the panel as illustrated in the diagram.
2. Slide the housing into the opening in the panel from the front.
3. Screw the fasteners onto the wall-mount housing.
4. Screw threaded rods into holders and tighten until
the housing is solidly seated on the panel wall. Afterwards, tighten the locking nuts.
Additional support is not necessary.
a0001131
Fig. 19: Panel installation (wall-mount housing)
Pipe mounting
The assembly should be performed by following the instructions in the diagram.
"
Caution!
If a warm pipe is used for installation, make sure that the housing temperature does not exceed the
max. permitted value of +60 °C (+140 °F).
a0001132
Fig. 20: Pipe mounting (wall-mount housing)
245(9.65)
~110 (~4.33)
210 (8.27)
+0.5 (+0.019)
–0.5(0.019)
+0.5 (+0.019)
–0.5(0.019)
mm (inch)
Ø 2070
(Ø 0.792.75)
~~6.1)155 (
mm (inch)

Table of Contents

Other manuals for Endress+Hauser Proline t-mass 65

Related product manuals