EasyManua.ls Logo

EOS Mini - Page 16

EOS Mini
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
EN Installation
The oat (G) opens or closes the valve (C) to ensure that the tank remains full.
The water level can be regulated by turning the oat.
A hose nozzle can be attached to the overow protection (F), through which any overow water
can be drained on site.
180
150
75
A. Reducing sleeve from ¾“ to ½“
B. Seal ¾“
C. Valve with ¾“ connection option
D. Float lever
E. Mounting bracket
F. Overow protection ½“
G. Float
Design overview
B C D EA
F
G G
C