Confidential
Revision Date of Issue Description
B August 6, 2010
Chapter 3
Made change in "3.1.2 Lubrication (p46)".
Made change in "3.2 Lubrication Points and Instructions (p48)".
• Made change in "Fig. 3-1 Lubrication of the Driven Pulley Holder (p48)".
• Made change in "Fig. 3-2 Lubrication of the Paper Guide Front Assy (PF Roller) (p48)".
• Made change in "Fig. 3-3 Lubrication of the Paper Guide Front Assy (EJ Roller) (p48)".
• Made change in "Fig. 3-5 Lubrication of the PF Holder (p48)".
• Made change in "Fig. 3-6 Lubrication of the Main Frame (1) (p49)".
• Made change in "Fig. 3-8 Lubrication of the EJ Pulley (p49)".
• Made change in "Fig. 3-9 Lubrication of the Ink System Assy (1) (p49)".
• Made change in "Fig. 3-10 Lubrication of the Ink System Assy (2) (p49)".
• Made change in "Fig. 3-11 Lubrication of the CR Assy (p49)".
• Made change in
"Fig. 3-12 Lubrication of the Scanner Unit (WorkForce 635/625 series) (p50)"
.
•
"Fig. 3-15 Lubrication of the Stopper Assy (WorkForce 625 series) (p51)"
has been added.
Chapter 4
Made change in "4.1 Power-On Sequence (p53)".
"4.3 Troubleshooting (p57)" has been added.