Introduction
11
Touch Unit Bracket
Use this when attaching the Touch Unit to outside of the projection surface.
Part Name Application
Touch Unit Bracket -
Template sheet (for Touch
Unit Bracket)
Attach this to the wall before attaching
the Touch Unit Bracket, and use it to
drill necessary holes.
M4 x 25mm hexagon socket
head cap bolts (x2)
Secure the Touch Unit to the Touch
Unit Bracket.
Hexagon wrench (for M4) -
Pen Stand
Part Name Application
Main unit -
Cover Attach to the front of the pen stand.
Spacers for screw holes x3 Attach them to the screw hole when
securing the pen stand with screws.
Necessary Items
As well as the items supplied, you also need to prepare the following screws and tools.