Maintenance 5. Actuator Units
278 N6 Rev.2
Installation
Joint #1
Actuator Unit
N6-A850*BR
Cable direction:
Upward
the attached O-ring on the Joint #1
Apply a thin coat of grease to the O
-ring.
Grease: SK-1A
Apply the grease to the Joint #1 actuator unit.
Grease: SK-1A 15g
Be careful not to leak the grease from the
shaded area
shown in the right.
Install the Joint #1 actuator unit to the Arm
#1.
Hexagon socket head cap bolts:
16-M5×35 (with plain washer)
Tightening torque: 10 ± 0.5 N·m
to have at least 2 people to perform
the operation since the parts being heavy.
Do not apply excessive shock to the parts.
-ring properly.
16-M5×35 (with plain washer)
Hexagon socket head cap bolts:
8-M6×40 (with plain washer)
Tightening torque: 18 ± 0.9 N·m
Refer to the picture for installing direction.
When installing it, pass the cables of the Joint
#
1 actuator unit through the hole of the base.
Be careful not to get the cables caught
in the
8-M6×40 (with plain washer)
For details, refer to the Removal steps (4) through (8) in Maintenance 4.3 Cable
Unit (N6-A850*R) Cable direction Standard (backward).
Install the cable unit inside the base.
For details, refer to the Removal steps (2) through (11), (13) through (18) in
Maintenance 4.4 Cable Unit (N6-A850*BR): Cable direction Upward.