EasyManua.ls Logo

Epson Stylus Photo 925 - Page 109

Epson Stylus Photo 925
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Stylus Photo 925 Revision A
Disassembly and Assembly Disassembly 109
6. Remove the two screws (C.P. SCREW, 3x4, F/ZN) securing the PF Motor, and
remove the PF Motor.
Figure 4-75. Removing the PF motor
T When installing the PF Motor Connector Cable in the Cable
Holder on the ASF Unit, place the cable as shown below.
Figure 4-76. Placing the PF Motor Connector Cable
C.P. SCREW, 3x4, F/ZN
PF Motor Connector Cable
T Install the PF Scale on the PF Roller Gear properly by referring
to 4.2.18.1 “PF Scale installation”.
T Plug the PF Motor Connector Cable in the connector (CN13) on
the Main Board securely.
T Tightening torque for screws
One screw securing the PF Encoder:
C.B.P. SCREW, 2.5x5, F/ZN : 2 ~ 4kgf.cm
Two screws securing the PF Motor:
C.P. SCREW, 3x4, F/ZN : 5 ~ 7kgf.cm
A D J U S T M E N T
R E Q U I R E D
T Once the combination gear 13.6, 33 has been removed from the
Main Frame, be sure to apply an appropriate amount of grease
G-26 to the specified points. (Refer to Figure 6-10. “Lubrication
point 9” in Chapter 6.)

Table of Contents

Other manuals for Epson Stylus Photo 925

Related product manuals