EasyManua.ls Logo

Epson Stylus Pro 7600 - Disassembly and Assembly of Ink Supply Mechanism; C472_SUB-B Board

Epson Stylus Pro 7600
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Stylus Pro 7600/9600 Revision A
Disassembly & Assembly Disassembly and Assembly of Ink Supply Mechanism 192
4.5 Disassembly and Assembly of Ink Supply
Mechanism
4.5.1 C472_SUB-B Board
1.
Remove the L Side Cover. (p.163)
2. Disconnect the seven FFCs (ink cartridge) and the two FFCs (Main Board/
Maintenance Tank) on the C472_SUB-B Board found at the left side of I/H Frame.
(See Figure 4-62)
3. Disconnect the connector of the Release Sensor (I/H Lever).
4. Remove the four screws (M3
×
6) and remove the C472_SUB-B Board.
Figure 4-62. Disconnecting the C472_SUB-B Board Connectors
C A U T I O N
When connecting an FFC, take great care not to insert it aslant.
(Inserting aslant can cause a short circuit of signals, thus resulting
in broken circuit elements.)
FFC (CSIC Relay Board) ×7
FFC (Maintenance Tank)
FFC (Main Board)
Screws (M3×6) ×4
Release Sensor (I/H Lever)

Table of Contents

Other manuals for Epson Stylus Pro 7600

Related product manuals