INSTALLATION
3 (6)
Uppgjord (även faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - No.
KL/ECS/S/LT Magnus Lindahl ECS/S/LT-96:5036
Dokansv/Godk - Doc respons/Approved Kontr - Checked Datum - Date Rev File
KI/ECS/S/LTC 1996-06-04 A
Error! Unknown switch argument.
PREPARATION OF INSTALLATION SITE
The installation site should meet the requirements for station units:
Normal temperature range +15°C to +35°C.
Extreme temperature -25°C to +15°C and +35°C to +55°C. (During operation in
extreme temperatures reduced radio data is accepted).
Atmospheric humidity 93%, non condensing.
The proposed installation site is prepared as follows:
Check that the wall is sufficiently strong to carry the load of the station unit.
Install the antenna and lay the antenna cable to the proposed installation site.
For lightning protection of antenna masts, see the recommendations given in chapter
5.
Arrange for an authorized electrician to lay the mains power cables or battery
power supply to the installation site.
Arrange with the Telecommunications Administration for installation of telephone
lines to the installation site and the lightning protection kit(s).
INSTALLATION
Packaging
When delivered, the station unit is packed in a special carton with shock-absorbent
material.
Check if the package is undamaged before opening it.
Examine the contents carefully, if the package has been damaged.
If there is any damage to the contents, contact the transport/forwarding company
shown on the Delivery Note.
Unpacking
Check that the accessories shown on the Packing Note are complete. If not, notify
our shipping department in Kumla, Sweden at once. Telephone international +46
19 584100. (national 019-584100.) or FAX No. +46 19 584510.
The station unit is basically supplied without accessories. Note that this also applies
to all external connection cables. Accessories must be ordered from a separate list.