EasyManua.ls Logo

Evo 300SB - Assemble Water Bottle Holder and Bottle; Assemble Computer Components

Evo 300SB
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 7: Assemble water bottle cage and water bottle
Tighten the water bottle holder (72) to main frame (1) using enclosed tools and put in
the water bottle (71).
Step 8: Assemble the computer
Tighten the computer sensor base (78) under the water bottle holder, facing the flywheel.
Attach the computer shelf (75) and put in the computer (74).