EasyManua.ls Logo

EWS OS 3030 - Production Phase Configuration; Production Phase Stage Timing; Production Phase Valve and Output Control

Default Icon
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OS3030 Changing and Scanning the Basic Values
9. "Production phase"
29
9. "Production" phase
The production phase comprises 3 time-dependent stages which run in con-
secutive order. The system remains in the subsequent stage 4 position until
the production phase has ended. If production is over and the pressure pump
is in operation, the system remains in this position for a further 3 seconds
before the pump starts running.
You define whether the input valve and the concentrate valve are open during
these 4 stages, and when the pressure pump kicks in.
In the case of equipment with an IF plug-in card, you also specify whether the
output relay is activated for each of the output functions selected in pro-
gramming steps 6.1 and 6.2.
If the "permeate valve" function has been selected in step 9.7, the valve con-
trol is dependent on conductivity during the "production" phase.
Set the time of the first
stage. The permissible
range is 0 to 999 seconds.
If you select 0, the stage is
skipped.
Specify which valves are
open, whether the high-
pressure pump is running
and whether the pro-
grammed OUT1 and OUT2 outputs, if present, are active. The functions pro-
grammed in programming steps 6.1 and 6.2 are active for these outputs.
Press INFO to see the meaning of the abbreviation in plain text.
PU = High-pressure pump PV = Permeate valve
IV = Input valve DO = Dosing
CV = Concentrate valve AP = Additional program
Set the time of the second
stage. The permissible
range is 0 to 999 seconds.
If you select 0, the stage is
skipped.
Program the values in ac-
cordance with programming
step 9.2
Set the time of the third
stage. The permissible
range is 0 to 999 seconds.
If you select 0, the stage is
skipped.
Program the values in ac-
cordance with programming
step 9.2
Program the values in ac-
cordance with programming
step 9.2..
The system remains in this
position until production is over.
S t e p n o . : 9 . 1
P r o d u c t i o n 1 6 0 s
S t e p n o . : 9 . 2
P U - I V | C V - P
V - D O
-
S t e p n o . : 9 . 3
P r o d u c t i o n 2 0 s
S t e p n o . : 9 . 4
P U - I V | C V - P
V - D O
-
S t e p n o . : 9 . 5
P r o d u c t i o n 3 0 s
S t e p n o . : 9 . 6
P U - I V | C V - P
V - D O
-
S t e p n o . : 9 . 7
P U | I V | C V - P
V - D O
-

Table of Contents

Related product manuals