Note: When assembling the foundation in this step only
hand-tighten the nuts. The corners may need to be
slightly loose to attach the corner uprights
Suggestion: If the unit is to be
installed on a concrete foundation
you will need to cut PRO210 flush
with the bottom of PRO6120.
You can lay the cut off PRO210
pieces on their side and use them
to secure the PRO6120 to the
concrete foundation.
Note: Before assembling
the foundation insert 3
M6x15 bolts as shown for
the sliding door guide.
See page J14-1.