EPS-LD External Power Supply Unit
Extreme Networks Consolidated ExtremeXOS Hardware Installation Guide
313
4 Loosen the thumbscrews on the front of the tray and slide the EPS-160 power supply out of the
EPS-T.
EPS-LD External Power Supply Unit
The Extreme Networks EPS-LD External Power Supply Unit can be added as a redundant power supply
to the Summit X450a-24t or Summit X450e-24p switch. When attached to the Summit X450e-24p, the
EPS-LD provides 465 W total power with 375 W dedicated for PoE applications.
Installing an EPS-LD
The external power supply box contains the following items:
One EPS-LD unit
Mounting hardware, including screws
One AC power cord (for use in North America)
One redundant power cord (1 meter long) for connecting the power supply to the switch
NOTE
If you are using the EPS-LD outside North America, the input power cord must have an IEC320-C14 connector and
the appropriate power input plug for the country in which you are operating. The cord must be 10 feet or less and at
least 16-gauge copper wire.
The EPS-LD unit can be mounted in a rack or placed free-standing on a tabletop. You can mount the
EPS-LD facing either the front or the back of the rack. For this reason, each unit has two sets of
mounting holes, two on each end. Mount the EPS-LD so that the unit’s output connectors are on the
same side as the external connector on the connecting switch.
CAUTION
Do not use the rack-mount brackets to suspend the EPS-LD from under a table or desk, or to attach the unit to a
wall.
Rack-mounting the EPS-LD
NOTE
When installing an EPS-LD in a rack, make sure air vents are not restricted. Allow for elevated ambient operating
temperatures when the EPS-LD is installed adjacent to other equipment. Be sure you mount the equipment in the
rack so that the load is evenly distributed.
To install the EPS-LD, you need the following tools and materials:
Electrostatic strap
#1 Phillips screwdriver