BlackDiamond 8800 Series Switches Hardware Installation Guide
89
5 At each side of the chassis, place one hand in an empty power supply bay and the other hand in the
recessed hand-hold on the back panel of the BlackDiamond 8810 chassis (Figure 53).
Figure 53: Gripping Points on the BlackDiamond 8810 Chassis
Do not use the fan tray handle to lift or maneuver the BlackDiamond 8810 chassis. This handle is not
designed to support the weight of the chassis.
6 Carefully lift the BlackDiamond 8810 chassis off the shipping pallet and onto the floor as shown
in Figure 54.
Figure 54: Correct Method for Lifting the BlackDiamond 8810 Chassis
Save all packaging, bolts, washers, and clip locks, as well as the box and pallet, for future use in the event
that the chassis must be moved to another location or returned to Extreme Networks.
ASP017A