·324·
Programming manual
CNC 8055
CNC 8055i
12.
PROBING
·M· & ·EN· MODELS
SOFT: V02.2X
PROBE 9. Boss measuring cycle
12.11.1 Basic operation
1. Positioning over the center of the boss.
Movement of the probe in rapid (G00) from the point where the cycle is called to the center of
the boss.
The approaching movement is made in two stages:
·1· Movement in the main work plane.
·2· Movement along the longitudinal axis up to a distance (B) from the programmed surface.
2. Movement to the first approach point.
This movement of the probe that is made in rapid (G00) consists of:
·1· Movement along the ordinate plane.
·2· Movement of the longitudinal axis the distance (2B).
3. Probing movement.
This movement consists of:
·1· Movement of the probe along the ordinate axis at the indicated feedrate (H), until the probe
signal is received.
The maximum distance to be traveled in the probing movement is "B+(J/2), if, after travelling
that distance, the CNC does not receive the probe signal, it will display the corresponding
error code and stop the movement of the axes.
·2· Return of the probe in rapid (G00) the distance indicated in (E).
·3· Movement of the probe along the abscissa axis at the indicated feedrate (F), until the probe
signal is received.
4. Movement to second approach point.
This movement of the probe that is made in rapid (G00) consists of:
·1· Withdrawal to the first approach point.
·2· Movement to a distance (B) above the boss, to the second approach point.
5. Second probing movement.
Same as the first probing.
6. Third approach movement.
Same as above.
7. Third probing movement.
Same as above.
8. Fourth approach movement.
Same as above.