Step 2: Preparing sump
K. Install the 2 set screws into the bridge
L. Insert DT-1002 (draw tube) into the bridge. Position DT-1002 about 1/8”
to 3/16” (approximately 2 quarters) from the surface of the sump. With
the DT-1002 in proper position tighten down the 2 set screws.
M. Remove the SC-5500 (sump clamp) from the SP-5500 (sump) and then
remove the SB-5500 (sump bridge). Leaving the SB-5500 and the DT-
1002 assembled.