EasyManua.ls Logo

Fass STK-5500 - Page 9

Fass STK-5500
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 2: Preparing sump
K. Install the 2 set screws into the bridge
L. Insert DT-1002 (draw tube) into the bridge. Position DT-1002 about 1/8”
to 3/16” (approximately 2 quarters) from the surface of the sump. With
the DT-1002 in proper position tighten down the 2 set screws.
M. Remove the SC-5500 (sump clamp) from the SP-5500 (sump) and then
remove the SB-5500 (sump bridge). Leaving the SB-5500 and the DT-
1002 assembled.