In
order
to
prevent
accidents
check
cable
at
regular intervals.
To
replace
the
cable
take
off
the
screws (24, 25),
then
take
off the handle
cover
t20), loosen the
two
screws (19)
of
the
terminal clamp (18)
and
clamp off
the
cable from the switch (2).
6.
Lubrication
We recommend
to
renew
the
gear grease
after
300
duty
hours. Please,
only
use
the
Fein special grease
FG
12.
For
ball
bearings which should
be lubricated
after
approx. 900
duty
hours
we
recommend
our
ball
bearing grease
FK
3.
The
ball
bearings
are
to
be rinsed in clean solvent
and
packed
with
new
grease.
The
space
between
inner
and
outer
ring
is
to
be
one
third
filled
with
grease
in
order
that
the
bearings
do
not
overheat.
Type
of
grease
FG
12 for gears
FK
3 for ball bearings
Grease tubes
d N
or
er
o.
MZ
60-3/FG
12
MZ
60-2/FK
3
Contents
oz
g
2
2
/a
80
11/a
40
No
claims
can
be
entertained
for
damage
due
to
negligent
maintenance
and
inadequate
lubrication.
7.
Overhaul
After
900
duty
hours
the
machine should be completely dismantled
as described under
paragraph
8
and
all
parts
should be thoroughly
cleaned. Rinse ball
beari~gs
and
gears
in
clean solvent
and
pack
with
fresh grease
as
per
paragraph
6.
Please
be
sure
that
all
electric
parts
are
only
cleaned
dry.
8.
Dismantling
The
tool should
onl
y be taken
apart
by
an
expert.
1. Unscrew fillister head screw (25)
and
the
two
cylindrical screws
(24),
then
take
off handle cover (20).
2.
Remove supply cable from switch,
draw
out
switch
and
disconnect
motor
cable.
3.
After
unscrewing the screws (10)
dra
w
out
carbon
holder
(5
).
Push
reversing
swith
(4) backwards. Distributi
on
of
connections
se
e con-
necting
plan.
4.
Loosen cylindrical screws (65, 66), remove
outer
bearin
g (
38
)
with
intermediate bearing (34)
and
take
apar
t.
5.
Pull
out
armature
(26), unscrew three screws (31)
and
remove
armature
drive
(30).
6.
Draw
insulation ring (14)
out
of
motor housing (1), unscrew cylin-
drical screws (13)
and
remove pole housing (12).
Re-assemble
in
reverse sequence.
Please
bear
in
mind
that
existing
washers
are
to
be
placed
in
the
right
places.
Their
loss
would
lead
to
damage.
9.
Repair
and
spare
parts
We recommend
our
Fein Service
Stat
ions to
carry
out
all ov
erhau
l a
nd
repair
work
quickly
and
expertly.
Please
quote
Order
Reference
when
ordering
spare
parts
or
send
in
sample
part,
stating
the
type
of
the
machine.
We
draw
your
att
ent
i
on
to
the
need to ca
rry
out
a high vo.
lt
ag
e test
in accordance w
ith
y
our
local regulations (
or
VDE
re
g
ul
a
tio~
0740)
before
taking
a tool i
nto
service after
any
repair
carried
out
by y
our
own
staff.
(