EasyManua.ls Logo

Felt IA - Page 11

Felt IA
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IA // ROUTING MANUAL
11
STEP 2
Connect a wire (1200mm)—shown in purple in the diagram—to the Junction A box located under the
front cover and route through the stem and into the frame where the top tube-mounted storage box
is located. Then continue routing through the downtube to Junction B box located around the bottom
bracket area. See Figure B2.
Figure B2