Pressure Calibrator
Verification Procedure
5
5. Carefully vent all pressure and disconnect the second pressure port.
DC Voltage Measure Verification
1. Push repeatedly until VOLTS is shown in the third row of the display.
2. Connect the Product red banana jack (V mA) to the 5522A HI VOLTS Output.
3. Connect the Product black banana jack (COM) to the 5522A LO VOLTS
Output.
4. Set the 5522A for the voltage setting in Table 3 and verify the display reading
on the Product.
Table 3. DC Voltage Measure Verification Tests
Applied Voltage from 5522A Lower limit Upper Limit
0.000 V -0.002 V 0.002 V
15.000 V 14.996 V 15.004 V
30.000 V 29.994 V 30.007 V
5. Set the 5522A to Standby.
DC Current Measure Verification
1. Press repeatedly until mA is shown in the third row of the display.
2. Connect the Product red banana jack (V mA) to the 5522A HI mA Output.
3. Connect the Product black banana jack (COM) to the 5522A LO mA Output.
4. Set the 5522A for the current setting in Table 4, and verify the display reading
on the Product.
Table 4. DC Current Measure Verification Tests
Applied Current from 5522A Lower limit Upper Limit
4.000 mA 3.997 mA 4.003 mA
12.000 mA 11.996 mA 12.004 mA
24.000 mA 23.994 mA 24.006 mA
5. Set the 5522A to Standby.