Load management
Load manage-
ment
"Rules"
It is possible for up to four different load management rules to be defined. At
the same threshold values, the rules are activated in succession. For deactiva-
tion, this is done in reverse; the I/O last switched on is the first to be switched
off. In the case of different thresholds, the I/O with the lowest threshold is
switched on first, followed by the second lowest, and so on.
IMPORTANT!
An I/O is activated/deactivated after 60 seconds.
"Load"
-
Control is "Off" (deactivated).
-
Control is effected by the "Power generated".
-
Control is effected by "Excess power" (with feed-in limits). This option can
only be selected if a meter has been connected. Control is effected using the
actual power of feeding in with respect to the grid.
"Thresholds"
-
"On": For entering an effective power limit, at which the output is activated.
-
"Off": For entering an effective power limit, at which the output is deactiv-
ated.
"Runtimes"
-
Field for activating the "Minimum runtime per switch-on process" for which
the output is to be activated for each switch-on process.
-
Field for activating the "Maximum runtime per day".
-
Field for activating the "Target runtime" for which the output is to be activ-
ated in total per day (several switch-on processes are allowed for).
78