5CS201115OM (rev 00 07/2020) 12
Control Valve Assembly
Control valve assembly is factory installed in a
vertical position to protect it during shipping.
This assembly should be re-positioned for
optimal use and accessibility following these
steps.
1. Carefully loosen bolts (A).
2. Rotate control valve to height required and
place bottom bolt in appropriate hole (B) for
desired position of valve. Tighten bolts.
Install Boom (18 ft and Boomless)
1. Center the boom on the rear of the main
sprayer.
2. Locate the (2) main upright support brackets
with holes.
3. Bolt the boom to the upright support
brackets using two 5/16 inch square U-bolts
(A) and four 5/16 inch ange nuts.
Install Boom (24 ft and 30 ft)
1. Center the boom on the rear of the main
sprayer.
2. Locate the (2) main upright support brackets
with holes.
3. Bolt the boom to the upright support
brackets using two 5/16 inch square U-bolts
(A) and four 5/16 inch ange nuts.
4. Fasten hinge brace to support brackets
using two 5/16 inch 3/4 inch ange bolts (B)
and two 5/16 inch ange nuts.
5. Secure side boom hinge to center boom
with hinge pin (A) and fasten with bowtie clip
(B).
B
B
A
A
B
Assembly
A
A
A