130 INF-TN1FSC-E
10.7 Flow velocity distribution display function (optional)
It is possible to measure the ow velocity distribution in real time by the pulse doppler method
and to display the ow state in the piping.
Use this function for judgment if the ow rate measuring position is appropriate, for diagnosis
of ow, for research, testing and others.
This function is applicable to the following types.
Main unit type: FSC1-
(with ow velocity distribution display function, if the 7th digit is "1")
Sensor type: FSDP2 (Bore diameter; φ40 to 200mm Fluid temperature; –40 to +100ºC)
FSDP1 (Bore diameter; φ100 to 400mm Fluid temperature; –40 to +80ºC)
FSDP0 (Bore diameter; φ200 to 1000mm Fluid temperature; –40 to +80ºC)
10.7.1 Installing Detector
(1) Processing of detector mounting surface
Remove rust, pitch, surface irregularity and others from the pipe surface, to which a sensor is to
be mounted, by the frame length of the sensor to be mounted, using thinner, sandpaper and/or
other appropriate means.
Note) If the piping outer circumference is wound with jute, remove the jute from the entire outer
circumference in a length that is frame length (L) + 200 mm.
Wound with jute
Piping
L200mm
(2) Installation of detector
(1) Wrap the belt around the pipe.
FSDP2, FSDP1
Adjusts the length of the wire rope according to the
piping size, xes the wire on the pipe.
FSDP0
(2) Fully screw up to the right side.