EasyManua.ls Logo

Fuji Electric ZKJ Series - Preparation for Operation; Warm-Up Operation and Regular Operation

Fuji Electric ZKJ Series
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 - 1
4.1 Preparation for operation
(1) Tube and wiring check
'RXEOHFKHFNLIWXEHVRIWKHJDVVDPSOLQJDQGH[KDXVWSRUWVDUHFRUUHFWO\FRQQHFWHG
'RXEOHFKHFNIRUSURSHUZLULQJ
4.2 Warm-up operation and regular operation
(1) Operation procedure
1) Turn ON the power switch on the front panel of the analyzer unit.
The measurement screen appears on the front display panel in 1 or 2 seconds.
2) Wait for about 4 hours until the instrument is warmed up.
$ERXWKRXUVDUHUHTXLUHGXQWLOWKHLQVWUXPHQWDOORZVDFFXUDWHPHDVXUHPHQW
4. OPERATION
When in warm-up, the concentration reading may be beyond.
upper limit of range or
lower limit of range.
But, it is not an error.
CAUTION
 6HWWLQJRIYDULRXVVHWYDOXHV
3HUIRUPWKHYDULRXVVHWWLQJVDFFRUGLQJWR³6HFWLRQ6HWWLQJDQG&DOLEUDWLRQ´
 =HURFDOLEUDWLRQDQGVSDQFDOLEUDWLRQ
Perform zero calibration and span calibration after warm-up operation.
5HIHUWR³6HFWLRQ&DOLEUDWLRQ´
5) Introduction and measurement of sampling gas
Introduce the sampling gas into the analyzer unit before starting measurement.
I - - - - I
1-
- -
-1

Related product manuals