2. Install the chamber.
Fit the four-sided holes of the chamber together with the hook fittings of the Fresh air intake kit
(in two places), and secure the attached chamber in place with screws provided.
Screw × 2
Hook fittings
Ø3-15/16 in (100 mm)
• When using the Insulation kit for high humidity (UTZ-KXGC), first cut off and remove the heat
insulation as shown in the figure.
•
Install the Insulation kit for high humidity according to the installation instruction sheet provid-
ed.
3-1/8 (80)
1-3/16 (30)
C
ut off
Unit: in (mm)
7-3. Fresh air intake kit for compact cassette type - (10-32) - 7. Optional parts installation
OPTIONAL
PARTS
OPTIONAL
PARTS